[DCIM_INTEGRATION]
Native connectors for Netbox, Device42, and Ralph. Tenants authenticate once and data flows on schedule. CSV upload is available as a fallback for everyone else.
The shared data pipeline between operators and colocation tenants. Replace spreadsheet chasing with DCIM integration, automated validation, and one-click EED, GRESB, and CSRD reports.
MANUAL DATA REQUESTS YIELD INCOMPLETE SCOPE-3 COVERAGE AND WEEKS OF CHASING.
Operators email dozens of tenants every reporting cycle. Tenants scramble to export from DCIM tools and format spreadsheets. Nobody enjoys this, and audits still fail.
One integration. Tenants connect their DCIM once; data syncs, validates, and aggregates automatically into EED, GRESB, and CSRD reports.
Native connectors for Netbox, Device42, and Ralph. Tenants authenticate once and data flows on schedule. CSV upload is available as a fallback for everyone else.
Automated checks against expected ranges and completeness rules, with a full audit trail on every submitted data point. No more guessing if the numbers are right.
Generate EED submissions, GRESB assessments, and ESG disclosures from validated, aggregated data. PUE, WUE, and CUE are calculated automatically.
Free self-service dashboard. Tenants connect their DCIM, see their own sustainability footprint, and control exactly what data each operator can access.
Global view of every tenant's data status, completeness scores, and report readiness. Onboard a new tenant with a single shareable link.
Data stays in the EU by design. GDPR-native architecture with OAuth 2.0 authentication and role-based access control for operators and tenants.
Facilities teams see tenant data completeness, collection status, and report readiness in one dashboard. Onboard new tenants with a shareable link.
Connect your Netbox (or upload CSV), choose exactly what data each operator can see, and you never fill a sustainability spreadsheet again.
Europe's data-center sustainability rules are multiplying. RackScope keeps you ahead of all of them.
EU Energy Efficiency Directive. Annual reporting for data centers with 500 kW+ installed IT power. Next deadline: May 2026.
The first global sustainability benchmark tailored to data centers, developed with iMasons.
Your enterprise tenants need Scope 3 data from you to meet their own CSRD obligations.
EU data center rating scheme — minimum performance standards, planned for adoption in 2026.
We're onboarding a small group of data center operators and tenants for the Q2 2026 pilot.
This website does not use tracking cookies. The early access form is provided by Tally (EU-hosted, GDPR-compliant). By submitting the form, you consent to Tally processing your email address. Read our privacy policy.